Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2017, 10:27 AM
  • 14 0250_14 0249A _02032017_022942.mp4

Date
02/03/2017
W/O
613594
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P20826
Time
2:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4230
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
WO_613594_TV14037_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0250
Downstream MH
14 0249A
Dir. of Survey
Downstream
Length Surveyed
329.6 ft.
Total Length
329.6 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
2
O&M Quick
412L
O&M Rating
134
Overall Index
3
Overall Quick
Overall Rating
329
Pipe schematic from manhole 14 0250 to 14 0249A
MH: 14 0250MH: 14 0249Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02502 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start327 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish327 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish329.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0249A329.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
329.6AMH14 0249A
0MWL
327DAGS
327SAP
329.6MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2MWM
2DAGS
0AMH14 0250
2SAP

Properties (6)

additional_info
SC306732
custom_field_two
3
customer
LACSD
datetime
2017-02-03T02:27:56-08:00
documentation
PRO PIPE
is_lateral_inspection
false