Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2017, 12:07 PM
  • 14 0246A_14 0246 _02012017_041005.mp4

Date
02/01/2017
W/O
613594
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18301
Time
4:07 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4227
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
WO_613594_TV14037_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0246A
Downstream MH
14 0246
Dir. of Survey
Downstream
Length Surveyed
210.1 ft.
Total Length
210.1 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
126
O&M Index
2
O&M Quick
412G
O&M Rating
88
Overall Index
3
Overall Quick
Overall Rating
214
Pipe schematic from manhole 14 0246A to 14 0246
MH: 14 0246AMH: 14 0246downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0246A0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MGO - General Observation - MAG COATING 50%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start209.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish209.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish210.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0246

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
2MGOMAG COATING 50%
0MWL
2DAGS
209.5DAGS
210.1AMH14 0246
2SAP
0AMH14 0246A
209.5SAP
0MWM

Properties (6)

additional_info
SC306729
custom_field_two
3
customer
LACSD
datetime
2017-02-01T04:07:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false