Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2016, 12:36 AM
  • 14 0247_14 0246A_02022017_030335.mp4

Date
12/19/2016
W/O
6135494
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00569
PipeID
P26494
Time
4:36 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4228
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
WO_613594_TV14037_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0247
Downstream MH
14 0246A
Dir. of Survey
Downstream
Length Surveyed
331.8 ft.
Total Length
331.8 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 14 0247 to 14 0246A
MH: 14 0247MH: 14 0246Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 02470 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area4.2 ft. MGO - General Observation - MAG COATING4.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start331.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0246A331.8 ft. MGO - General Observation - CONNECTION AT 9 O CLOCK331.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
4.2MGOMAG COATING
4.2DAGS
0AMH14 0247
0MWL
331.8AMH14 0246A
331.8MGOCONNECTION AT 9 O CLOCK
331.8SAP
4.2SAP
331.8DAGS
0MWM

Properties (5)

additional_info
SC306730
custom_field_two
3
customer
LACSD
datetime
2016-12-19T16:36:29-08:00
is_lateral_inspection
false