Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2017, 10:18 AM
  • 14 0250A_14 0250 _02032017_021901.mp4

Date
02/03/2017
W/O
613594
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18306
Time
2:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4230
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
WO_613594_TV14037_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0250A
Downstream MH
14 0250
Dir. of Survey
Downstream
Length Surveyed
174.4 ft.
Total Length
174.4 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
102
O&M Index
2
O&M Quick
412F
O&M Rating
74
Overall Index
3
Overall Quick
Overall Rating
176
Pipe schematic from manhole 14 0250A to 14 0250
MH: 14 0250AMH: 14 0250downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 0250A0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start111.8 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"172.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish172.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish174.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0250

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
172.6SAP
111.8TBA
0MWM
2SAP
174.4AMH14 0250
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH14 0250A
172.6DAGS
0DAGS

Properties (6)

additional_info
SC306732
custom_field_two
3
customer
LACSD
datetime
2017-02-03T02:18:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false