Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 18, 2017, 08:34 AM
  • H 0860_H 0859 _01182017_015727.mp4

Date
01/18/2017
W/O
613425
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00938
PipeID
P20420
Time
12:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4213
Sewer Name
H JOINT OUTFALL H - UNIT 7B RELIEF
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
WO_613425_TV15072_JAN2017
Sewer Type
Gravity
Material
RCP-PTL
Shape
Circular
Height
66 in.
Width
66 in.
Upstream MH
H 0860
Downstream MH
H 0859
Dir. of Survey
Downstream
Length Surveyed
534.4 ft.
Total Length
534.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2T00
O&M Rating
212
Overall Index
2
Overall Quick
Overall Rating
212
Pipe schematic from manhole H 0860 to H 0859
MH: H 0860MH: H 0859downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 08600 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start531.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish534.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK534.4 ft. AMH - Downstream Manhole, Survey Ends - H 0859

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
534.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
531.9DAGS
0MWL
0AMHH 0860
534.4AMHH 0859
2DAGS
0MWM

Properties (7)

additional_info
SC306715
custom_field_two
4
customer
LACSD
datetime
2017-01-18T00:34:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
34292