Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 29, 2016, 10:20 AM
  • 15 0959_15 0958 _29062016_032107.mp4

Date
06/29/2016
W/O
579948
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00592
PipeID
P12736
Time
3:20 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3549
Sewer Name
15 AMAR ROAD RELIEF TRUNK
City
LA PUENTE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
WO_579948_TV15138_JULY2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
15 0958
Downstream MH
15 0959
Dir. of Survey
Upstream
Length Surveyed
226.8 ft.
Total Length
226.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
92
Pipe schematic from manhole 15 0958 to 15 0959
MH: 15 0958MH: 15 0959upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 09591.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish48.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES224.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start226.8 ft. MWM - Water Mark, 25 %of cross sectional area226.8 ft. MWL - Water Level, 25 %of cross sectional area226.8 ft. AMH - Downstream Manhole, Survey Begins - 15 0958

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
2DAGS
226.8AMH15 0959
225.1DAGS
0MWL
0AMH15 0958
178.5DSZ

Properties (7)

additional_info
SC305778
custom_field_two
4
customer
LACSD
datetime
2016-06-29T03:20:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30544