Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2016, 07:27 AM
  • 18 0919_18 0918_062416_002821.mpg

Date
06/24/2016
W/O
574406
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00709
PipeID
P14771
Time
12:27 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3405
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_574406_TV18102_JUNE2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0919
Downstream MH
18 0918
Dir. of Survey
Downstream
Length Surveyed
15.5 ft.
Total Length
15.5 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0919 to 18 0918
MH: 18 0919MH: 18 0918downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 09190 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES13.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish15.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0918

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES

    12 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
0AMH18 0919
0MWM
13.9SAP
12SSS
0MWL
2SAP
15.5AMH18 0918

Properties (5)

additional_info
SC305855
custom_field_two
3
customer
LACSD
datetime
2016-06-24T00:27:55-07:00
is_lateral_inspection
false