02 1595_02 1594_20160816_020728.mpg
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start
4.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
8.2 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
11.1 ft. - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"
43.3 ft. - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"
58.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
103 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
132.8 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
168.8 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
180.4 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
| Distance | Code | Observation |
|---|---|---|
| 2 | DAGS | — |
| 8.2 | TFC | — |
| 103 | TFB | — |
| 132.8 | TFB | — |
| 0 | AMH | 02 1595 |
| 207 | DAGS | — |
| 168.8 | TFB | — |
| 43.3 | TFB | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 207 | AMH | 02 1594 |
| 4.2 | CM | — |
| 58.1 | TFC | — |
| 180.4 | TFB | — |
| 11.1 | TFB | — |
| 0 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 207 | VC | — |
| 0 | VC | — |