Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2016, 10:36 AM
  • B 1053_B 1052_08192016_034756.mp4

Date
08/19/2016
W/O
585984
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00923
PipeID
P22897
Time
3:36 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3687
Sewer Name
B JOINT OUTFALL B - UNIT 1C REPLACEMENT
City
PICO RIVERA, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
24
Purpose
Routine Assessment
Project
WO_585984_TV02129_AUG2016
Sewer Type
Gravity
Material
RGRCP-PTL
Shape
Circular
Height
78 in.
Width
78 in.
Upstream MH
B 1053
Downstream MH
B 1052
Dir. of Survey
Downstream
Length Surveyed
614.3 ft.
Total Length
614.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole B 1053 to B 1052
MH: B 1053MH: B 1052downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 105312.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start605.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish611.3 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE614.3 ft. AMH - Downstream Manhole, Survey Ends - B 1052

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    12.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
614.3AMHB 1052
611.3MGOCONNECTION AT THE MH 3 O'CLOCK ACTIVE
605.1DAGS
0MWL
0MWM
0AMHB 1053
12.1DAGS

Properties (6)

additional_info
SC306017
custom_field_two
4
customer
LACSD
datetime
2016-08-19T03:36:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false