Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2016, 07:10 AM
  • 29 0311_29 0310_20160831_012329.mp4

Date
08/31/2016
W/O
585951
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01015
PipeID
P24325
Time
12:10 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3694
Sewer Name
29 EASTSIDE INTERCEPTOR SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_585951_TV29058_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0311
Downstream MH
29 0310
Dir. of Survey
Downstream
Length Surveyed
306.6 ft.
Total Length
306.6 ft.
Structural Index
3
Structural Quick
5111
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 29 0311 to 29 0310
MH: 29 0311MH: 29 0310downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 03110 ft. MWM - Water Mark, 10 %of cross sectional area127.4 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"261.1 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"299.8 ft. B - Broken, from 12 to 04 o'clock, within 8 inches of joint: YES - W/ REPAIR VISIBLE299.8 ft. JOM - Joint Offset Medium306.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0310

Observation photos (2)

  • Broken, from 12 to 04 o'clock, within 8 inches of joint: YES - W/ REPAIR VISIBLE

    299.8 ft. - Broken, from 12 to 04 o'clock, within 8 inches of joint: YES - W/ REPAIR VISIBLE

  • Joint Offset Medium

    299.8 ft. - Joint Offset Medium

Observations (8)

DistanceCodeObservation
299.8BW/ REPAIR VISIBLE
127.4TFA
261.1TFA
0MWL
0AMH29 0311
0MWM
306.6AMH29 0310
299.8JOM

Properties (6)

additional_info
SC306024
custom_field_two
3
customer
LACSD
datetime
2016-08-31T00:10:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false