Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 22, 2016, 09:38 AM
  • H 1400_H 1399 _22082016_005902.mp4

Date
08/22/2016
W/O
585476
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01204
PipeID
P25684
Time
2:38 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3570
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_585476_TV22034_AUG2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1400
Downstream MH
H 1399
Dir. of Survey
Downstream
Length Surveyed
206.6 ft.
Total Length
206.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole H 1400 to H 1399
MH: H 1400MH: H 1399downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 14000 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT 80%67 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"92.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"138.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"194.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.6 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK206.6 ft. AMH - Downstream Manhole, Survey Ends - H 1399

Observations (11)

DistanceCodeObservation
0MWL
194.9TFC
0MGOLATERAL AT MH 3 OCLOCK
67TFC
92.6TFC
0AMHH 1400
0MWM
206.6MGOLATERAL AT MH 3 OCLOCK
206.6AMHH 1399
138.5TFC
2.1MGOMAG COAT 80%

Properties (6)

additional_info
SC306154
custom_field_two
4
customer
LACSD
datetime
2016-08-22T02:38:47-07:00
documentation
PROPIPE
is_lateral_inspection
false