Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 1, 2016, 09:11 AM
  • 29 0500_29 0496 _20160901_031529.mp4

Date
09/01/2016
W/O
579989
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00985
PipeID
P24548
Time
2:11 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3698
Sewer Name
29 CHERRY AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_579989_TV29019_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0500
Downstream MH
29 0496
Dir. of Survey
Downstream
Length Surveyed
145.2 ft.
Total Length
145.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 29 0500 to 29 0496
MH: 29 0500MH: 29 0496downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 05000 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start143.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish145.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0496

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWL
0MWM
2.6DAGS
0AMH29 0500
145.2AMH29 0496
0MGOCONNECTION AT THE MH 9 O'CLOCK
143.4DAGS

Properties (6)

additional_info
SC306028
custom_field_two
4
customer
LACSD
datetime
2016-09-01T02:11:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false