Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2016, 07:04 AM
  • 03 0318_03 0317_19052016_000509.mp4

Date
05/19/2016
W/O
573469
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00359
PipeID
P04892
Time
12:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3354
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
23
Purpose
Routine Assessment
Project
WO_573469_JUNE2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Lining Method
Segmented Panel
Shape
Circular
Height
30 in.
Upstream MH
03 0318
Downstream MH
03 0317
Dir. of Survey
Downstream
Length Surveyed
325.3 ft.
Total Length
325.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
324
Pipe schematic from manhole 03 0318 to 03 0317
MH: 03 0318MH: 03 0317downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 03180 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start323.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish323.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish325.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 8 O'CLOCK325.3 ft. AMH - Downstream Manhole, Survey Ends - 03 0317325.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 4 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2SAP
0MWM
323.9SSS
325.3MGOACTIVE CONNECTION AT MH 8 O'CLOCK
0AMH03 0318
2SSS
325.3AMH03 0317
323.9SAP
325.3MGOACTIVE CONNECTION AT MH 4 O'CLOCK
0MWL

Properties (6)

additional_info
SC305634
custom_field_two
3
customer
LACSD
datetime
2016-05-19T00:04:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false