03 0059_03 0058_11082017_104131.mp4

6.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

6.1 ft. - Obstacles Other, 15 %of cross sectional area, from 04 to 08 o'clock, Start - SLUDGE

13.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

38.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

113.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

177.9 ft. - Obstacles Other, 15 %of cross sectional area, from 04 to 08 o'clock, Finish - .
| Distance | Code | Observation |
|---|---|---|
| 6.1 | DAGS | — |
| 38.5 | DAE | — |
| 95.1 | TB | — |
| 177.9 | OBZ | . |
| 6.1 | OBZ | SLUDGE |
| 250.7 | TB | — |
| 13.4 | DAE | — |
| 332.7 | AMH | 03 0058 |
| 195.8 | TB | — |
| 0 | AMH | 03 0059 |
| 0 | MWL | — |
| 330.2 | DAGS | — |
| 330.1 | DAE | — |
| 113.2 | DAE | — |
| 0 | MWM | — |