Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2017, 10:39 AM
  • G 0155_G 0154_9152017_053201.mp4

  • G 0155_G 0154_9152017_060420.mp4

Date
09/15/2017
W/O
0646302
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P00836
Time
3:39 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0644
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20170915MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0155
Downstream MH
G 0154
Dir. of Survey
Downstream
Length Surveyed
390.7 ft.
Total Length
390.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole G 0155 to G 0154
MH: G 0155MH: G 0154downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:15AM0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 70% START 9:00 TO 3:002 ft. MGO - General Observation - TILES 100% IN PLACE START22.4 ft. MGO - General Observation - MAG COAT 95% START67.6 ft. MGO - General Observation - TILES 100% INTACT UNDER MAG COAT67.6 ft. MGO - General Observation - MAG COAT 60% START134.2 ft. MGO - General Observation - CAMERA LIGHT PROBLES207.1 ft. MGO - General Observation - TILES 100% IN PLACE247.9 ft. MGO - General Observation - MAG COAT 70% START390.2 ft. MGO - General Observation - TILES 100% IN PLACE FINISH390.2 ft. MGO - General Observation - MAG COAT 70% FINISH390.7 ft. AMH - Downstream Manhole, Survey Ends - 6:05AM

Observation photos (7)

  • General Observation - MAG COAT 70% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 70% START 9:00 TO 3:00

  • General Observation - TILES 100% IN PLACE START

    2 ft. - General Observation - TILES 100% IN PLACE START

  • General Observation - MAG COAT 95% START

    22.4 ft. - General Observation - MAG COAT 95% START

  • General Observation - TILES 100% INTACT UNDER MAG COAT

    67.6 ft. - General Observation - TILES 100% INTACT UNDER MAG COAT

  • General Observation - MAG COAT 60% START

    67.6 ft. - General Observation - MAG COAT 60% START

  • General Observation - TILES 100% IN PLACE

    207.1 ft. - General Observation - TILES 100% IN PLACE

  • General Observation - MAG COAT 70% START

    247.9 ft. - General Observation - MAG COAT 70% START

Observations (14)

DistanceCodeObservation
2MGOMAG COAT 70% START 9:00 TO 3:00
0MWM
134.2MGOCAMERA LIGHT PROBLES
390.2MGOTILES 100% IN PLACE FINISH
2MGOTILES 100% IN PLACE START
67.6MGOTILES 100% INTACT UNDER MAG COAT
0AMH5:15AM
390.2MGOMAG COAT 70% FINISH
247.9MGOMAG COAT 70% START
67.6MGOMAG COAT 60% START
207.1MGOTILES 100% IN PLACE
0MWL
390.7AMH6:05AM
22.4MGOMAG COAT 95% START

Properties (6)

custom_field_three
TILE LINE -TILES 100% IN PLACE
custom_field_two
3
customer
LACSD
datetime
2017-09-15T03:39:20-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false