- Date
- 09/13/2017
- W/O
- 0657889
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBERGON
- Sewer ID
- Z00014
- PipeID
- P00123
- Time
- 8:35 AM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7512
- Sewer Name
- 08 MAIN STREET EXTENSION TRUNK
- City
- LOS ANGELES
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 08
- Page No.
- 01
- Purpose
- Routine Assessment
- Project
- 20170912SHO_MAIN_STREET_EXTENSION_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 12 in.
- Upstream MH
- 08 0096
- Downstream MH
- 08 0094
- Dir. of Survey
- Downstream
- Length Surveyed
- 426.1 ft.
- Total Length
- 426.1 ft.
- Structural Index
- 4
- Structural Quick
- 4231
- Structural Rating
- 11
- O&M Index
- 3
- O&M Quick
- 4121
- O&M Rating
- 6
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 17
Pipe schematic from manhole 08 0096 to 08 0094 Observation photos (4)

2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

24.3 ft. - Fracture Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES

100.4 ft. - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

382.4 ft. - General Observation - WATER LEVEL RISES DUE TO CROSS CONNECTION AT MH 94