Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2017, 11:05 AM
  • G 0164_G 0163_9132017_052558.mp4

Date
09/13/2017
W/O
0646302
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P00845
Time
4:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0643
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Capital Improvement Program Assesment
Project
20170911MDM_JOINT_OUTFALL_G_UNIT_8
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
G 0164
Downstream MH
G 0163
Dir. of Survey
Downstream
Length Surveyed
280.8 ft.
Total Length
280.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole G 0164 to G 0163
MH: G 0164MH: G 0163downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:05AM1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO, Start - INSIDE MH2 ft. MGO - General Observation - MAG COAT 90% START 8:00 TO 4:002 ft. MGO - General Observation - TILES 100% IN PLACE UNDER MAG COAT6.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO, Finish38.3 ft. MGO - General Observation - MAG COAT 90% WITH THIN GREASE COAT118.9 ft. MGO - General Observation - TILES 100% INOLACE UNDER MAG COAT118.9 ft. MGO - General Observation - MAG COAT 90%280.2 ft. MGO - General Observation - MAG COAT 90% FINISH280.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active280.2 ft. MGO - General Observation - TILES 100% IN PLACE UNDER MAG COAT280.8 ft. AMH - Downstream Manhole, Survey Ends - 5:30AM

Observation photos (6)

  • Deposits Attached Grease, 10 %of cross sectional area, from 07 to 08 o'clock,  , within 8 inches of joint: NO, Start - INSIDE MH

    1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO, Start - INSIDE MH

  • General Observation - MAG COAT 90% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 90% START 8:00 TO 4:00

  • General Observation - TILES 100% IN PLACE UNDER MAG COAT

    2 ft. - General Observation - TILES 100% IN PLACE UNDER MAG COAT

  • General Observation - MAG COAT 90% WITH THIN GREASE COAT

    38.3 ft. - General Observation - MAG COAT 90% WITH THIN GREASE COAT

  • General Observation - TILES 100% INOLACE UNDER MAG COAT

    118.9 ft. - General Observation - TILES 100% INOLACE UNDER MAG COAT

  • General Observation - MAG COAT 90%

    118.9 ft. - General Observation - MAG COAT 90%

Observations (15)

DistanceCodeObservation
118.9MGOTILES 100% INOLACE UNDER MAG COAT
280.8AMH5:30AM
0MWM
118.9MGOMAG COAT 90%
280.2MGOMAG COAT 90% FINISH
2MGOMAG COAT 90% START 8:00 TO 4:00
2MGOTILES 100% IN PLACE UNDER MAG COAT
0MGOConn. @ Mh, 3 O' Clock. Active
280.2MGOConn. @ Mh, 9 O' Clock. Active
1DAGSINSIDE MH
0MWL
6.5DAGS
38.3MGOMAG COAT 90% WITH THIN GREASE COAT
0AMH5:05AM
280.2MGOTILES 100% IN PLACE UNDER MAG COAT

Properties (7)

custom_field_three
TILE LINE -TILES 100% IN PLACE
custom_field_two
3
customer
LACSD
datetime
2017-09-13T04:05:44-07:00
documentation
MARTIN,MANANES,REVELES.OLIVER 111
is_lateral_inspection
false
lining
RCP-CTL