Section#10_05 2618_05 2617__8252017__G6810.mp4
4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
7.9 ft. - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - DEBRIS
35 ft. - General Photograph - SEVERE SPALLING
71 ft. - General Observation - SEVERE SPALLING
109.6 ft. - General Photograph - SEVERE SPALLING
133.1 ft. - Hole Soil Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - COULD BE CEMENT BEHIND
133.1 ft. - Broken, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
171.7 ft. - Survey Abandoned - TOO MUCH DEBRIS
| Distance | Code | Observation |
|---|---|---|
| 171.7 | MSA | TOO MUCH DEBRIS |
| 138.2 | B | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 35 | MGP | SEVERE SPALLING |
| 7.9 | DSZ | DEBRIS |
| 71 | MGO | SEVERE SPALLING |
| 109.6 | MGP | SEVERE SPALLING |
| 171.7 | SSS | — |
| 133.1 | HSV | COULD BE CEMENT BEHIND |
| 133.1 | B | — |
| 0 | AMH | 0240 |
| 4 | SSS | — |
| 171.7 | DSZ | DEBRIS |