Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2016, 09:23 AM
  • 05 1027_05 1026 _12282016_014143.mp4

Date
12/28/2016
W/O
613357
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00421
PipeID
P06261
Time
1:23 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3950
Sewer Name
05 AVIATION BOULEVARD TRUNK
City
HAWTHORNE, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
WO_613357_TV05010_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
05 1027
Downstream MH
05 1026
Dir. of Survey
Downstream
Length Surveyed
364 ft.
Total Length
364.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
144
Pipe schematic from manhole 05 1027 to 05 1026
MH: 05 1027MH: 05 1026downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 10270 ft. MWL - Water Level, 10 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start361 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish364.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1026364.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
0AMH05 1027
361DAGS
364.1AMH05 1026
364.1MGOCONNECTION AT MH 3 O'CLOCK
2.2DAGS
0MWL

Properties (6)

additional_info
SC317698
custom_field_two
4
customer
LACSD
datetime
2016-12-28T01:23:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false