Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2016, 07:08 AM
  • 03 0400_03 0399 _12272016_232455.mp4

Date
12/27/2016
W/O
613343
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00371
PipeID
P04975
Time
11:08 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3901
Sewer Name
03 MARINA TRUNK, SECTION 2
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
25
Purpose
Routine Assessment
Project
WO_613343_TV03019_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
03 0400
Downstream MH
03 0399
Dir. of Survey
Downstream
Length Surveyed
304.5 ft.
Total Length
304.6 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
8
O&M Index
2
O&M Quick
2P11
O&M Rating
169
Overall Index
2
Overall Quick
Overall Rating
177
Pipe schematic from manhole 03 0400 to 03 0399
MH: 03 0400MH: 03 0399downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 04000 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK MADE0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK ACTIVE2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start15 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES42.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"79.1 ft. VC - Vermin Cockroach95.4 ft. CS - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES102.1 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"130.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES137.5 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 04 to 08 o'clock, Start - DEBRIS NOT VISIBLE145.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish145.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start152 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"199.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"204.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"237.5 ft. CC - Crack Circumferential, from 12 to 04 o'clock, within 8 inches of joint: YES241.4 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 04 to 08 o'clock, Finish - DEBRIS NOT VISIBLE253.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"301.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish304.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK MADE304.6 ft. AMH - Downstream Manhole, Survey Ends - 03 0399

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

    15 ft. - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    95.4 ft. - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    130.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    145.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 12 to 04 o'clock, within 8 inches of joint: YES

    237.5 ft. - Crack Circumferential, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
304.6MGOCONNECTION AT MH 3 O'CLOCK MADE
237.5CC
0MWM
137.5OBZDEBRIS NOT VISIBLE
15FC
2.1DAGS
0MWL
145.6DAGS
42.2TF
145.6DAGS
79.1VC
152TBC
102.1TBC
301.3DAGS
241.4OBZDEBRIS NOT VISIBLE
304.6AMH03 0399
95.4CS
130.6CM
253.9TBA
0AMH03 0400
0MGOCONNECTION AT MH 3 O'CLOCK MADE
199.7TBC
0MGOCONNECTION AT MH 9 O'CLOCK ACTIVE
204.3TB

Properties (6)

additional_info
SC305242
custom_field_two
3
customer
LACSD
datetime
2016-12-27T23:08:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false