Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 29, 2016, 06:18 AM
  • 15 0267_15 0266_28042016_231853.mp4

Date
04/28/2016
W/O
568733
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12190
Time
11:18 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3335
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_568733_TV15133_MAY2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0267
Downstream MH
15 0266
Dir. of Survey
Downstream
Length Surveyed
454.6 ft.
Total Length
454.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Q00
O&M Rating
180
Overall Index
2
Overall Quick
Overall Rating
180
Pipe schematic from manhole 15 0267 to 15 0266
MH: 15 0267MH: 15 0266downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02670 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - MAG COATING 70%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start92.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"354 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"398.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"452.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish454.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0266

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
398.8TFC
354TBA
452.9DAGS
0MWL
0AMH15 0267
454.6AMH15 0266
92.6TFC
2MGOMAG COATING 70%
302.4TFC
197.3TFC
2DAGS
0MWM

Properties (6)

additional_info
SC305609
custom_field_two
4
customer
LACSD
datetime
2016-04-28T23:18:05-07:00
documentation
PRO PIPE
is_lateral_inspection
false