05 1544_05 1543_12122017_022136.mp4
1 ft. - General Observation - CRACK IN STACK POURING WATER
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
5.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
19.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
19.7 ft. - General Observation - 18" RCP
64.7 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
145.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
436.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - PEELED CONCRETE & DEBRIE
437.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: YES
443.9 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
453.3 ft. - General Observation - WHITE COATING ON PIPE FROM CONN
454.1 ft. - General Observation - WHITE COATING ON PIPE
604.9 ft. - Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
604.9 ft. - Surface Reinforcement Corroded, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
688.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 593 | MWL | — |
| 443.9 | SAP | SEVERE AGG |
| 631.8 | MWL | — |
| 19.7 | SAP | SEVERE AGG |
| 548.3 | MWL | — |
| 5.2 | SAV | SEVERE AGG SPORATIC |
| 717.3 | SSS | BLISTERTING PEELING CONCRETE |
| 365 | MWL | — |
| 441.6 | TB | Active |
| 145.2 | SSS | PEELING CONCRETE |
| 604.9 | SRC | CIRCUM REBAR |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 631.8 | MWM | — |
| 548.3 | MWM | — |
| 469.3 | MWM | — |
| 19.7 | MGO | 18" RCP |
| 67.8 | SRV | CIRCUM REBAR |
| 0 | MWM | — |
| 717.3 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 604.9 | SRC | CIRCUM REBAR |
| 469.3 | MWL | — |
| 49.7 | SAP | SEVERE AGG |
| 1 | MGO | CRACK IN STACK POURING WATER |
| 454.1 | MGO | WHITE COATING ON PIPE |
| 314.6 | DSZ | PEELED CONCRETE |
| 0 | MWL | — |
| 437.1 | DAGS | — |
| 692.3 | MGO | ZOOM 25' |
| 167.2 | DSZ | PEELED CONCRETE |
| 717.3 | SAV | SEVERE AGG |
| 453.3 | MGO | WHITE COATING ON PIPE FROM CONN |
| 717.8 | AMH | 3:30AM |
| 593 | DSZ | PEELED CONCRETE & DEBRIE |
| 688.5 | SSS | PEELING CONCRETE |
| 0 | AMH | 2:25AM |
| 436.5 | DSZ | PEELED CONCRETE & DEBRIE |
| 64.7 | SRV | CIRCUM REBAR |