Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2017, 06:14 PM
  • H 0410_H 0409_1272017_101615.mp4

Date
12/07/2017
W/O
0630217
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00177
PipeID
P10844
Time
10:14 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7576
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
WHITTIER
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Capital Improvement Program Assesment
Project
20171207DF_JOINT_OUTFALL_H_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0410
Downstream MH
H 0409
Dir. of Survey
Downstream
Length Surveyed
592 ft.
Total Length
592 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0410 to H 0409
MH: H 0410MH: H 0409downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:14 AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG COAT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start196.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"250.3 ft. MGP - General Photograph - PEELING AND FLAKING442.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"442.2 ft. MGP - General Photograph567.3 ft. MGP - General Photograph590 ft. MGO - General Observation - Grease Throughout The Reach (5%)591.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish591.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish591.8 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 30% MAG COAT592 ft. AMH - Downstream Manhole, Survey Ends - 11:23 AM

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG COAT

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - PEELING AND FLAKING

    250.3 ft. - General Photograph - PEELING AND FLAKING

  • General Photograph

    442.2 ft. - General Photograph

  • General Photograph

    567.3 ft. - General Photograph

Observations (16)

DistanceCodeObservation
0MWM
590MGOGrease Throughout The Reach (5%)
2SSS
567.3MGP
591.8SAV
196.1TFC
442.2TFA
591.8SSS
2SZ30% MAG COAT
250.3MGPPEELING AND FLAKING
591.8SZ30% MAG COAT
2SAV
442.2MGP
0MWL
0AMH10:14 AM
592AMH11:23 AM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2017-12-07T10:14:21-08:00
documentation
FRANKLIN, PARAISO, BRAR, VENDRYES
is_lateral_inspection
false