Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2017, 09:49 AM
  • B 0239_B 0238 _03052017_024955.mp4

Date
05/03/2017
W/O
635407
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00077
PipeID
P08707
Time
2:49 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4442
Sewer Name
B JOINT OUTFALL B - UNIT 1E
City
ROSEMEAD
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11
Purpose
Routine Assessment
Project
WO_635407_TV02153_MAY2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0239
Downstream MH
B 0238
Dir. of Survey
Downstream
Length Surveyed
329.6 ft.
Total Length
329.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole B 0239 to B 0238
MH: B 0239MH: B 0238downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 02390 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start99.7 ft. MMC - Material Change, Vitrified clay pipe101.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.6 ft. MMC - Material Change, Concrete pipe (non-reinfored)174.6 ft. MMC - Material Change, Vitrified clay pipe176.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.1 ft. MMC - Material Change, Concrete pipe (non-reinfored)327.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish327.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.6 ft. AMH - Downstream Manhole, Survey Ends - B 0238

Observation photos (6)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    99.7 ft. - Material Change, Vitrified clay pipe

  • Material Change, Concrete pipe (non-reinfored)

    102.6 ft. - Material Change, Concrete pipe (non-reinfored)

  • Material Change, Concrete pipe (non-reinfored)

    177.1 ft. - Material Change, Concrete pipe (non-reinfored)

Observations (16)

DistanceCodeObservation
329.6AMHB 0238
174.6MMC
2SAV
0AMHB 0239
327.6DAGS
0MWL
102.6MMC
327.6SSS
0MWM
176.1TFC
101.9TFC
2SSS
99.7MMC
2DAGS
327.6SAV
177.1MMC

Properties (5)

additional_info
SC345215
custom_field_two
3
customer
LACSD
datetime
2017-05-03T02:49:11-07:00
is_lateral_inspection
false