Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2017, 11:07 AM
  • 15 0572_15 0571 _14042017_040754.mp4

Date
04/14/2017
W/O
630147
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00629
PipeID
P12501
Time
4:07 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4467
Sewer Name
15 SANTA ANITA OUTFALL TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_630147_TV15085_APR2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
15 0572
Downstream MH
15 0571
Dir. of Survey
Downstream
Length Surveyed
400.4 ft.
Total Length
400.4 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
152
Pipe schematic from manhole 15 0572 to 15 0571
MH: 15 0572MH: 15 0571downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 05729.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK9.4 ft. MGO - General Observation - UNMAPPED MH23.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start91.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.7 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"132.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.1 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES137.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"263.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"307.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"357.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"376 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"383.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"400.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish400.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0571 X

Observation photos (2)

  • Deposits Settled Other,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO, Start

    23.8 ft. - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    134.1 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
263.7TB
9.4MGOCONNECTION AT MH 3 O'CLOCK
132.5TB
383.7TB
91.9TB
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
400.4DSZ
137.6TB
0MWL
121.7TF
400.4AMH15 0571 X
23.8DSZ
307.9TF
376TB
208.9TB
0AMH15 0572
9.4MGOUNMAPPED MH
134.1CL
357.8TB
296.4TB

Properties (5)

additional_info
SC345176
custom_field_two
4
customer
LACSD
datetime
2017-04-14T04:07:35-07:00
is_lateral_inspection
false