Section#1_A 0343_A 0342__7272017__G6784.mp4
2 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 95% START 8:00 TO 4:00
105 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG
223.3 ft. - General Observation - LOOSE GASKET JOINT MATERIAL
445 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING, FLAKING CONCRETE
445 ft. - General Observation - MAG CO0AT 80% START
797.7 ft. - General Observation - LOOSE JOINT GSAKET MATERIAL THROUGHOUT REACH
| Distance | Code | Observation |
|---|---|---|
| 223.3 | MGO | LOOSE GASKET JOINT MATERIAL |
| 797.7 | MGO | LOOSE JOINT GSAKET MATERIAL THROUGHOUT REACH |
| 260.2 | SAV | SEVERE AGG |
| 797.7 | MGO | MAG COAT 80% FINISH |
| 797.7 | SSS | BLISTERING FLAKING CONCRETE |
| 798.1 | AMH | 5:20AM |
| 2 | SAV | SEVERE AGG |
| 0 | AMH | 4:35AM |
| 0 | MWM | — |
| 260.2 | SAV | SEVERE AGG |
| 105 | SAV | SEVERE AGG |
| 445 | SSS | BLISTERING, FLAKING CONCRETE |
| 445 | MGO | MAG CO0AT 80% START |
| 2 | SAV | SEVERE AGG |
| 0 | MWL | — |
| 2 | MGO | MAG COAT 95% START 8:00 TO 4:00 |