Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 21, 2017, 07:00 AM
  • 02 0022_02 0021_7212017_003257.mp4

  • 02 0022_02 0021_7212017_010650.mp4

Date
07/21/2017
W/O
0641143
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00234
PipeID
P03052
Time
12:00 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0598
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Capital Improvement Program Assesment
Project
20170721VMR_ARTESIA_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0021
Downstream MH
02 0022
Dir. of Survey
Upstream
Length Surveyed
330.5 ft.
Total Length
330.5 ft.
Structural Index
1
Structural Quick
1A00
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
1
Overall Quick
Overall Rating
12
Pipe schematic from manhole 02 0021 to 02 0022
MH: 02 0021MH: 02 0022upstream0 ft. AMH - Upstream Manhole, Survey Ends - 12:58 AM20.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"65.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"68.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"69.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES78.5 ft. CC - Crack Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES124 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES125.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"129.6 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES154.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"155.5 ft. CC - Crack Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES172.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"214.5 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"219.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"221 ft. CC - Crack Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES241.9 ft. CC - Crack Circumferential, from 10 to 01 o'clock, within 8 inches of joint: YES246.5 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4"248 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES270.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"271.7 ft. CC - Crack Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES272.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"304.4 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES307 ft. CC - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES330.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 8"330.5 ft. MWM - Water Mark, 40 %of cross sectional area330.5 ft. MWL - Water Level, 20 %of cross sectional area330.5 ft. AMH - Downstream Manhole, Survey Begins - 12:18 AM

Observation photos (2)

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4"

    84 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4"

  • Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES

    260.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
109.5CC
200.9CC
260.8DAGS
0TFC
23.5CC
0MWM
158.1TFC
116TFA
26.1CC
0MWL
205.2TFC
206.5CC
252CC
175.7TFC
0AMH12:18 AM
175CC
60.2TFC
310.1TFC
58.4TFC
84TB
58.8CC
330.5AMH12:58 AM
82.5CC
110.6TFC
88.6CC
265.1TFC
262.4TFA

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2017-07-21T00:00:00-07:00
is_lateral_inspection
false