Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2019, 09:38 AM
  • B 1095_B 1094 _05012019_030216.mp4

Date
05/01/2019
W/O
761338
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z01124
PipeID
P13720
Time
2:38 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6526
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_761338_TV02344_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1095
Downstream MH
B 1094
Dir. of Survey
Downstream
Length Surveyed
838.3 ft.
Total Length
838.3 ft.
Structural Index
3
Structural Quick
3`00
Structural Rating
495
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
499
Pipe schematic from manhole B 1095 to B 1094
MH: B 1095MH: B 1094downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 109510 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE833.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish838.3 ft. AMH - Downstream Manhole, Survey Ends - B 1094838.3 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT PIPE

    10 ft. - General Observation - MAG COAT THROUGHOUT PIPE

Observations (8)

DistanceCodeObservation
838.3AMHB 1094
0MWL
0MWM
0AMHB 1095
838.3MGOCONNECTION IN MH 3 OCLOCK
10SAP
10MGOMAG COAT THROUGHOUT PIPE
833.4SAP

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-05-01T02:38:46-07:00
documentation
PROPIPE
is_lateral_inspection
false