Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2019, 08:27 AM
  • 14 0231A_14 0231_01252019_005121.mp4

Date
01/25/2019
W/O
745521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00575
PipeID
P18282
Time
12:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6367
Sewer Name
14 NORTH SIDE TRUNK
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_745521_TV14057_JAN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0231A
Downstream MH
14 0231
Dir. of Survey
Downstream
Length Surveyed
418.8 ft.
Total Length
418.8 ft.
Structural Index
3
Structural Quick
3O22
Structural Rating
246
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
249
Pipe schematic from manhole 14 0231A to 14 0231
MH: 14 0231AMH: 14 0231downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0231A15.5 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start16.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51 ft. JOL - Joint Offset Large57.7 ft. JSM - Joint Separated Medium57.7 ft. JOM - Joint Offset Medium74.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"135.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"374.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"406.3 ft. OBZ - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - METAL ROD416.3 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish418.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0231, RUN LIST STATES 271'.

Observation photos (5)

  • Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    15.5 ft. - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Large

    51 ft. - Joint Offset Large

  • Joint Separated Medium

    57.7 ft. - Joint Separated Medium

  • Joint Offset Medium

    57.7 ft. - Joint Offset Medium

  • Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - METAL ROD

    406.3 ft. - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - METAL ROD

Observations (17)

DistanceCodeObservation
0MWL
254.9TFC
418.8AMH14 0231, RUN LIST STATES 271'.
57.7JSM
57.7JOM
317.4TFC
15.5CM
416.3CM
0MWM
406.3OBZMETAL ROD
16.7TFC
51JOL
135.5TFC
74.1TFC
0AMH14 0231A
374.4TFC
197.6TFC

Properties (6)

additional_info
SC365684
custom_field_two
3
customer
LACSD
datetime
2019-01-25T00:27:21-08:00
documentation
PRO PIPE
is_lateral_inspection
false