Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2018, 07:34 AM
  • 05 0824_05 0823 _08112018_233438.mp4

Date
11/08/2018
W/O
735499
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00419
PipeID
P06054
Time
11:34 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6215
Sewer Name
05 ARLINGTON AVENUE EXTENSION TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_735499_TV05345_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0824
Downstream MH
05 0823
Dir. of Survey
Downstream
Length Surveyed
93.5 ft.
Total Length
93.5 ft.
Structural Index
2
Structural Quick
312C
Structural Rating
39
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
39
Pipe schematic from manhole 05 0824 to 05 0823
MH: 05 0824MH: 05 0823downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 08240 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"16.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH 5% LESS92 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish93.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish93.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK93.5 ft. AMH - Downstream Manhole, Survey Ends - 05 0823

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
92MGOGREASE THROUGHOUT THE REACH 5% LESS
92SSS
0MGOCONNECTION AT MH 9 O'CLOCK
93.5CM
0MWM
0AMH05 0824
7.1TFC
93.5MGOCONNECTION AT MH 3 O'CLOCK
0MWL
50.9TFC
57.6TFC
16.5CM
2SSS
93.5AMH05 0823

Properties (6)

additional_info
SC364243
custom_field_two
3
customer
LACSD
datetime
2018-11-08T23:34:10-08:00
documentation
PROPIPE
is_lateral_inspection
false