Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2018, 10:28 AM
  • 05 0809_05 0808 _09112018_022844.mp4

Date
11/09/2018
W/O
735499
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00419
PipeID
P06040
Time
2:28 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6215
Sewer Name
05 ARLINGTON AVENUE EXTENSION TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_735499_TV05345_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0809
Downstream MH
05 0808
Dir. of Survey
Downstream
Length Surveyed
338 ft.
Total Length
338 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
3
O&M Quick
4411
O&M Rating
17
Overall Index
3
Overall Quick
Overall Rating
352
Pipe schematic from manhole 05 0809 to 05 0808
MH: 05 0809MH: 05 0808downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 08092 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"22.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"72 ft. RFL - Roots Fine Lateral, at 02 o'clock72 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"120.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.8 ft. RBL - Roots Ball Lateral, at 10 o'clock, 75 %173.2 ft. RBL - Roots Ball Lateral, at 02 o'clock, 75 %173.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"220 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"220.1 ft. RBL - Roots Ball Lateral, at 10 o'clock, 75 %222.3 ft. RBL - Roots Ball Lateral, at 02 o'clock, 75 %222.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"270 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"319.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"336 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH 5% LESS336 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338 ft. AMH - Downstream Manhole, Survey Ends - 05 0808338 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
222.3RBL
123.1TFC
3.6CM
19.7TFC
169.8TF
72RFL
336MGOGREASE THROUGHOUT THE REACH 5% LESS
173.2RBL
22.6TFC
338AMH05 0808
72TF
120.5TF
173.2TF
0MWL
0MWM
270TFC
222.3TF
69.5TFC
338CM
336SSS
319.7TFC
169.8RBL
322.3TFC
2SSS
220.1RBL
0AMH05 0809
272.1TFC
220TF

Properties (6)

additional_info
SC364243
custom_field_two
3
customer
LACSD
datetime
2018-11-09T02:28:25-08:00
documentation
PROPIPE
is_lateral_inspection
false