Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 27, 2019, 09:02 AM
  • 22 0467_22 0466 _02272019_010243.mp4

Date
02/27/2019
W/O
750841
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00816
PipeID
P16805
Time
1:02 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6406
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_750841_TV22049_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0467
Downstream MH
22 0466
Dir. of Survey
Downstream
Length Surveyed
277.7 ft.
Total Length
277.7 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
165
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
3
Overall Quick
Overall Rating
275
Pipe schematic from manhole 22 0467 to 22 0466
MH: 22 0467MH: 22 0466downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04670 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT 75%80.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"261.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"275.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish277.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0466277.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 75%

    2 ft. - General Observation - MAG COATING THROUGHOUT 75%

Observations (18)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
275.6SAP
261.2TFA
0MWM
277.7AMH22 0466
2SAP
275.6DAGS
2DAGS
2MGOMAG COATING THROUGHOUT 75%
0AMH22 0467
80.7TFA
0MWL
140.3TFC
201.4TFA
277.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK
84.7TFA
197.4TFA
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (5)

additional_info
SC365921
custom_field_two
2
customer
LACSD
datetime
2019-02-27T01:02:36-08:00
is_lateral_inspection
false