C 0382_C 0381 _022719_013651.mp4
2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
50.1 ft. - Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES
102.4 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start
118.3 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
147.4 ft. - Infiltration Dripper, from 11 to 12 o'clock, within 8 inches of joint: YES
260.9 ft. - Infiltration Gusher, at 10 o'clock, within 8 inches of joint: NO
585.8 ft. - Infiltration Runner, at 01 o'clock, within 8 inches of joint: YES
602.2 ft. - Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES
602.6 ft. - Infiltration Runner, at 10 o'clock, within 8 inches of joint: YES
607.2 ft. - Alignment Left, 10 %, Start
637.4 ft. - Surface Reinforcement Corroded, from 02 to 05 o'clock, within 8 inches of joint: NO, Start
| Distance | Code | Observation |
|---|---|---|
| 118.3 | SRC | — |
| 147.4 | ID | — |
| 602.2 | IR | — |
| 14 | DSC | — |
| 242.7 | DSC | — |
| 187.4 | MGO | CAMERA UNSTABLE DUE TO DEBRIS |
| 2.9 | DAGS | — |
| 655 | SSS | — |
| 654.7 | SRV | — |
| 607.2 | LL | — |
| 637.4 | TB | POSSIBLE INFILTRATION RUNNER - RIGHT SIDE OF TBI |
| 0 | MGO | ACTIVE SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 602.6 | IR | — |
| 50.1 | IG | — |
| 150.5 | SRC | — |
| 2.4 | SRV | — |
| 656.9 | AMH | C 0381 |
| 157.6 | MWLS | — |
| 654.7 | SRC | — |
| 6.3 | VC | — |
| 102.4 | MWLS | — |
| 260.9 | IG | — |
| 187.4 | DSC | — |
| 2.2 | SAP | — |
| 654.7 | DAGS | — |
| 637.4 | SRC | — |
| 619.7 | TB | — |
| 2 | SSS | — |
| 0 | MWM | — |
| 585.8 | IR | — |
| 0 | MWL | — |
| 0 | AMH | C 0382 |
| 654.7 | DSC | — |
| 654.7 | SAP | — |
| 654.7 | LL | — |