C 0383_C 0382 _022719_011627.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
17.1 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
20.4 ft. - Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES
26.2 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES
34.2 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
36.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
60.8 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - CORRODED MAG COATING
236.2 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 17.1 | IG | — |
| 362.4 | MGO | ACTIVE SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 3.4 | SAP | — |
| 20.4 | SRV | — |
| 2 | SSS | — |
| 359 | SSS | — |
| 0 | MWL | — |
| 236.2 | IG | — |
| 0 | AMH | C 0383 |
| 60.8 | DAZ | CORRODED MAG COATING |
| 359.8 | DAGS | — |
| 359.8 | SAP | — |
| 362.4 | AMH | C 0382 |
| 359.8 | DAZ | — |
| 41.9 | DSC | — |
| 359.8 | SRV | — |
| 359.8 | DSC | — |
| 34.2 | ID | — |
| 3 | DAGS | — |
| 36.3 | SRV | — |
| 26.2 | IR | — |
| 0 | MWM | — |