Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 27, 2019, 08:49 AM
  • C 0384_C 0383 _022719_005058.mp4

Date
02/27/2019
W/O
750577
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00142
PipeID
P09848
Time
12:49 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5818
Sewer Name
C JOINT OUTFALL C - UNIT 8D
City
LAKEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750577_TV19030_FEB2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
C 0384
Downstream MH
C 0383
Dir. of Survey
Downstream
Length Surveyed
274.6 ft.
Total Length
274.6 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
3
O&M Quick
5232
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
37
Pipe schematic from manhole C 0384 to C 0383
MH: C 0384MH: C 0383downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03843.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.9 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAG COATING CORRODED8 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES15.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start87.2 ft. IG - Infiltration Gusher, at 10 o'clock, within 8 inches of joint: NO89.8 ft. SRV - Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES, Start238.2 ft. LL - Alignment Left, 10 %, Start242.7 ft. ID - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES244.3 ft. SRV - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: NO257.8 ft. LL - Alignment Left, 10 %, Finish261 ft. IG - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES262.3 ft. LR - Alignment Right, 5 %273.1 ft. SRV - Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES, Finish273.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish273.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish273.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish274.6 ft. AMH - Downstream Manhole, Survey Ends - C 0383

Observation photos (11)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MAG COATING CORRODED

    3.9 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAG COATING CORRODED

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    8 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Gusher, at 10 o'clock, within 8 inches of joint: NO

    87.2 ft. - Infiltration Gusher, at 10 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES, Start

    89.8 ft. - Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 10 %, Start

    238.2 ft. - Alignment Left, 10 %, Start

  • Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

    242.7 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: NO

    244.3 ft. - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: NO

  • Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES

    261 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES

  • Alignment Right, 5 %

    262.3 ft. - Alignment Right, 5 %

Observations (22)

DistanceCodeObservation
31.8DSC
262.3LR
0MWL
273.1SRV
3.9DAGS
0MWM
244.3SRV
0AMHC 0384
3.9DAZMAG COATING CORRODED
15.7SAP
273.1SAP
242.7ID
257.8LL
89.8SRV
8ID
261IG
274.6AMHC 0383
87.2IG
238.2LL
273.1DAZ
273.1DAGS
273.1DSC

Properties (6)

additional_info
SC366391
custom_field_two
2
customer
LACSD
datetime
2019-02-27T00:49:35-08:00
is_lateral_inspection
false
year_laid
26643