Wastewater/Activity/PacpInspection/1.0Jan 28, 2019, 12:26 PM
  • 32 1190_32 1004 _01282019_043803.mp4

Date
01/28/2019
W/O
745464
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19451
Time
4:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6368
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_745464_TV32053_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1004
Downstream MH
32 1190
Dir. of Survey
Upstream
Length Surveyed
246.5 ft.
Total Length
246.5 ft.
Structural Index
2
Structural Quick
312I
Structural Rating
99
O&M Index
2
O&M Quick
412I
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
201
Pipe schematic from manhole 32 1004 to 32 1190
MH: 32 1004MH: 32 1190upstream0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 32 119039.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"240.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start244.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start244.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start246.5 ft. MGO - General Observation - DROP CONNECTION @ D/S MH - 12 O'CLOCK246.5 ft. AMH - Downstream Manhole, Survey Begins - 32 1004246.5 ft. MWM - Water Mark, 50 %of cross sectional area246.5 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
246.5SAP
5.9SSS
2DAGS
0MGODROP CONNECTION @ D/S MH - 12 O'CLOCK
246.5SSS
0AMH32 1004
0MWM
0MWL
246.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
207TFC
2SAP
246.5DAGS
246.5AMH32 1190

Properties (5)

additional_info
SC365685
custom_field_two
2
customer
LACSD
datetime
2019-01-28T04:26:34-08:00
is_lateral_inspection
false