Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2016, 11:13 AM
  • 32 1205_32 1204_08042016_041353.mp4

Date
04/08/2016
W/O
563392
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19659
Time
4:13 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3312
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
05
Purpose
Routine Assessment
Project
WO_563392_TV32023_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
32 1205
Downstream MH
32 1204
Dir. of Survey
Downstream
Length Surveyed
501.5 ft.
Total Length
501.5 ft.
Structural Index
3
Structural Quick
3S22
Structural Rating
301
O&M Index
2
O&M Quick
2S00
O&M Rating
198
Overall Index
3
Overall Quick
Overall Rating
499
Pipe schematic from manhole 32 1205 to 32 1204
MH: 32 1205MH: 32 1204downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12042 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING 80%105.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start499.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish499.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish501.5 ft. AMH - Downstream Manhole, Survey Ends - 32 1204

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    105.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWM
105.9SSS
499.3SSS
0MWL
501.5AMH32 1204
2DAGS
0AMH32 1204
499.3DAGS
2MGOMAG COATING 80%

Properties (6)

additional_info
SC305439
custom_field_two
4
customer
LACSD
datetime
2016-04-08T04:13:37-07:00
is_lateral_inspection
false
year_laid
19730727