Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 26, 2018, 05:03 PM
  • 02 2290_02 2420_12262018_091227.mp4

Date
12/26/2018
W/O
735503
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00244
PipeID
P22319
Time
9:03 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K 5916
Sewer Name
02 DISTRICT #2 MAIN TRUNK
City
COMMERCE CA
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
WO_735503_TV02377_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
02 2420
Downstream MH
02 2290
Dir. of Survey
Upstream
Length Surveyed
112.7 ft.
Total Length
112.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 02 2420 to 02 2290
MH: 02 2420MH: 02 2290upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 22900.7 ft. MGO - General Observation - @ U/S MH (02 2290) - SOIL VISIBLE - 12 TO 6 O'CLOCK3.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish36.3 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start72.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES112.7 ft. AMH - Downstream Manhole, Survey Begins - 02 2420112.7 ft. MGO - General Observation - @ D/S MH - SOIL & DAMAGED PIPE VISIBLE (STACK AREA) 10 TO 12 O'CLOCK112.7 ft. MWL - Water Level, 10 %of cross sectional area112.7 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    39.9 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    76.4 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
109.3DSC
0AMH02 2420
0MGO@ D/S MH - SOIL & DAMAGED PIPE VISIBLE (STACK AREA) 10 TO 12 O'CLOCK
0MWL
112MGO@ U/S MH (02 2290) - SOIL VISIBLE - 12 TO 6 O'CLOCK
39.9FL
76.4DSC
0MWM
112.7AMH02 2290

Properties (5)

custom_field_two
1
customer
LACSD
datetime
2018-12-26T09:03:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false