Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 26, 2018, 09:55 AM
  • E 0102_E 0101_09262018_025556.mp4

Date
09/26/2018
W/O
718146
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00031
PipeID
P11329
Time
2:55 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6046
Sewer Name
E JOINT OUTFALL E - UNIT 4 RELOCATION
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_718146_TV01089_AUG2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0102
Downstream MH
E 0101
Dir. of Survey
Downstream
Length Surveyed
39.4 ft.
Total Length
39.4 ft.
Structural Index
3
Structural Quick
5237
Structural Rating
45
O&M Index
2
O&M Quick
4127
O&M Rating
18
Overall Index
3
Overall Quick
Overall Rating
63
Pipe schematic from manhole E 0102 to E 0101
MH: E 0102MH: E 0101downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 01020 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start29.4 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start39.4 ft. AMH - Downstream Manhole, Survey Ends - E 010139.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish39.4 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish39.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE39.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK39.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish39.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    29.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    39.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
0AMHE 0102
39.4AMHE 0101
0MWL
2SAP
39.4DAGS
2SSS
39.4SRV
0MWM
39.4MGOCOCKROACHES IN MANHOLE
39.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2DAGS
39.4SSS
29.4SRV
39.4SAP

Properties (6)

additional_info
SC365109
custom_field_two
2
customer
LACSD
datetime
2018-09-26T02:55:17-07:00
is_lateral_inspection
false
year_laid
30530