Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2018, 06:17 PM
  • B 0009_B 0008_16052018_114434.mp4

Date
05/16/2018
W/O
701684
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00072
PipeID
P08519
Time
11:17 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5670
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
17
Purpose
Routine Assessment
Project
WO_701684_TV30071_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
144 in.
Width
144 in.
Upstream MH
B 0009
Downstream MH
B 0008
Dir. of Survey
Downstream
Length Surveyed
317.7 ft.
Total Length
317.7 ft.
Structural Index
4
Structural Quick
5L3W
Structural Rating
678
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
678
Pipe schematic from manhole B 0009 to B 0008
MH: B 0009MH: B 0008downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 00090 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start29.9 ft. SRP - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start317.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish317.6 ft. SRP - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish317.7 ft. AMH - Downstream Manhole, Survey Ends - B 0008

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

    29.9 ft. - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

Observations (11)

DistanceCodeObservation
317.6SAP
2.1MGOMAG COAT
0MWL
2.1SAP
29.9SRP
317.7AMHB 0008
317.6SRV
0AMHB 0009
0MWM
317.6SRP
2.1SRV

Properties (6)

additional_info
SC359328
custom_field_two
3
customer
LACSD
datetime
2018-05-16T11:17:50-07:00
is_lateral_inspection
false
year_laid
36930