Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2018, 08:43 PM
  • B 0005_B 0004_17052018_150305.mp4

Date
05/17/2018
W/O
701684
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00072
PipeID
P08515
Time
1:43 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5672
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
16
Purpose
Routine Assessment
Project
WO_701684_TV30071_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
144 in.
Width
144 in.
Upstream MH
B 0005
Downstream MH
B 0004
Dir. of Survey
Downstream
Length Surveyed
945.7 ft.
Total Length
945.7 ft.
Structural Index
4
Structural Quick
5e3…
Structural Rating
1989
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
1989
Pipe schematic from manhole B 0005 to B 0004
MH: B 0005MH: B 0004downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 00050 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT58.2 ft. SRP - Surface Reinforcement Projecting, from 09 to 02 o'clock, within 8 inches of joint: NO161.2 ft. SRP - Surface Reinforcement Projecting, from 09 to 04 o'clock, within 8 inches of joint: NO, Start477.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"817 ft. SRP - Surface Reinforcement Projecting, at 12 o'clock, within 8 inches of joint: NO934.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"945.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish945.7 ft. SRP - Surface Reinforcement Projecting, from 09 to 04 o'clock, within 8 inches of joint: NO, Finish945.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish945.7 ft. AMH - Downstream Manhole, Survey Ends - B 0004

Observation photos (5)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 09 to 02 o'clock, within 8 inches of joint: NO

    58.2 ft. - Surface Reinforcement Projecting, from 09 to 02 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Projecting, from 09 to 04 o'clock, within 8 inches of joint: NO, Start

    161.2 ft. - Surface Reinforcement Projecting, from 09 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, at 12 o'clock, within 8 inches of joint: NO

    817 ft. - Surface Reinforcement Projecting, at 12 o'clock, within 8 inches of joint: NO

Observations (16)

DistanceCodeObservation
477.6TF
945.7SRV
0MWM
817SRP
161.2SRP
58.2SRP
0MWL
945.7SRP
934.9TFA
2.1SRV
945.7SAP
2.1SAP
2.1MGOMAG COAT
0AMHB 0005
0MGOCONNECTION AT MH 3 O'CLOCK
945.7AMHB 0004

Properties (6)

additional_info
SC359330
custom_field_two
1
customer
LACSD
datetime
2018-05-17T13:43:10-07:00
is_lateral_inspection
false
year_laid
36930