C 0309_C 0308 _08052018_030618.mp4
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
354.7 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES
394.8 ft. - Infiltration Runner, at 10 o'clock, within 8 inches of joint: YES
397 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
416.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
419.9 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 419.9 | DAGS | — |
| 0 | AMH | C 0308 |
| 432.5 | AMH | C 0309 |
| 430 | SSS | — |
| 310.8 | TBA | — |
| 378 | DAR | — |
| 430 | DAR | — |
| 0 | MWL | — |
| 96.7 | TBA | — |
| 0 | MWM | — |
| 432.5 | SAV | — |
| 416.5 | SRV | — |
| 432.5 | SRV | — |
| 354.7 | IR | — |
| 397 | SAP | — |
| 432.5 | DAGS | — |
| 432.5 | SAP | — |
| 2 | SSS | — |
| 432.5 | MGO | ACTIVE CONNECTIONS AT MH 12, 3, 9 O'CLOCK |
| 403 | DAE | GREASE/ENCRUSTATION |
| 132 | DAE | GREASE/ENCRUSTATION |
| 394 | IR | — |
| 204.3 | TBA | — |
| 368 | DAE | GREASE/ENCRUSTATION |
| 394.8 | IR | — |
| 354 | IR | — |
| 2 | SAV | — |