Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 18, 2018, 07:25 AM
  • 18 0281_18 0280 _18052018_004633.mp4

Date
05/18/2018
W/O
701652
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00702
PipeID
P14109
Time
12:25 AM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5613
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
WO_701652_TV18178_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0281
Downstream MH
18 0280
Dir. of Survey
Downstream
Length Surveyed
344.4 ft.
Total Length
344.4 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
204
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
204
Pipe schematic from manhole 18 0281 to 18 0280
MH: 18 0281MH: 18 0280downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 02810 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAGNESIUM H.O. START16.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"18.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"66.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"69.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"115.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"118.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"140.3 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 8"164 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"167 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"212.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"215.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"264.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"267.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"315.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"319.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"341.7 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH341.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish344.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0280

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNESIUM H.O. START

    2.5 ft. - General Observation - MAGNESIUM H.O. START

Observations (23)

DistanceCodeObservation
341.7MGOMAGNEZIUM H.O. FINISH
167TFC
319.4TF
66.8TFC
18.7TFC
315.7TFC
212.7TFC
2.5SAV
69.8TFC
341.7SAV
344.4AMH18 0280
115.6TF
16.1TFC
164TFC
264.3TFC
0AMH18 0281
0MWL
267.3TFC
140.3TB
215.7TFC
0MWM
2.5MGOMAGNESIUM H.O. START
118.5TFC

Properties (5)

additional_info
SC359168
custom_field_two
3
customer
LACSD
datetime
2018-05-18T00:25:53-07:00
is_lateral_inspection
false