Wastewater/Activity/PacpInspection/1.0Apr 27, 2018, 06:45 PM
  • 18 0431_18 0430 _08052018_003733.mp4

Date
04/27/2018
W/O
701393
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00675
PipeID
P14279
Time
11:45 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5314
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
WO_701393_TV18097_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0431
Downstream MH
18 0430
Dir. of Survey
Downstream
Length Surveyed
448.3 ft.
Total Length
448.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 18 0431 to 18 0430
MH: 18 0431MH: 18 0430downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 04310 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area3.3 ft. MGO - General Observation - MAGNEZIUM H.O COATING start3.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start25.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"77.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"126.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"178.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"200.8 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start226.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"278.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"326.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"378.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"427.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"446.3 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish446.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish446.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish448.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0430

Observation photos (3)

  • General Observation - MAGNEZIUM H.O COATING start

    3.3 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    200.8 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
378.5TFC
25.2TFC
427.3TFC
77.5TFA
446.3DSF
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
3.3MGOMAGNEZIUM H.O COATING start
200.8DSF
126.1TFC
326.9TFC
0AMH18 0431
448.3AMH18 0430
278.2TFC
446.4MGOMAGNEZIUM H.O COATING finish
226.7TFC
446.4SAP
3.3SAP
0MWL
178.1TFC
0MWM

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2018-04-27T11:45:39-07:00
is_lateral_inspection
false