Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2018, 06:45 PM
  • 18 0430_18 0429 _08052018_012749.mp4

Date
04/27/2018
W/O
701393
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00675
PipeID
P14278
Time
11:45 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
K5314
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
WO_701393_TV18097_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0430
Downstream MH
18 0429
Dir. of Survey
Downstream
Length Surveyed
454.4 ft.
Total Length
454.4 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0430 to 18 0429
MH: 18 0430MH: 18 0429downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04300 ft. MWM - Water Mark, 15 %of cross sectional area6 ft. MGO - General Observation - MAGNEZIUM H.O COATING start23 ft. SAV - Surface Aggregate Visible, from 03 to 09 o'clock, within 8 inches of joint: YES28.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"58.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"153.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"242.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"343.1 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start347.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"378.3 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish450.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish450.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish454.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0429

Observation photos (4)

  • General Observation - MAGNEZIUM H.O COATING start

    6 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Visible, from 03 to 09 o'clock, within 8 inches of joint: YES

    23 ft. - Surface Aggregate Visible, from 03 to 09 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    58.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    343.1 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
153.5TFC
23SAV
0MWL
450.7MGOMAGNEZIUM H.O COATING finish
454.4AMH18 0429
58.7SAP
0AMH18 0430
347.4TFC
450.7SAP
6MGOMAGNEZIUM H.O COATING start
28.6TFC
242.4TFC
0MWM
343.1DSF
378.3DSF
81.2TFC

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2018-04-27T11:45:39-07:00
is_lateral_inspection
false