Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 06:44 PM
  • 18 0749_18 0748 _08052018_231044.mp4

Date
05/09/2018
W/O
701388
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14602
Time
11:44 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5315
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_701388_TV18103_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
18 0749
Downstream MH
18 0748
Dir. of Survey
Downstream
Length Surveyed
408.4 ft.
Total Length
408.4 ft.
Structural Index
3
Structural Quick
3_00
Structural Rating
474
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
474
Pipe schematic from manhole 18 0749 to 18 0748
MH: 18 0749MH: 18 0748downstream0 ft. MWL - Water Level, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07490 ft. MWM - Water Mark, 45 %of cross sectional area2 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - VISIBLE/PROJECTING9.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start400 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - VISIBLE/PROJECTING400.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish400.8 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish408.4 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT408.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0748

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING start

    9.9 ft. - General Observation - MAGNEZIUM H.O COATING start

Observations (11)

DistanceCodeObservation
9.9SAP
400.8MGOMAGNEZIUM H.O COATING finish
9.9MGOMAGNEZIUM H.O COATING start
0MWL
0AMH18 0749
0MWM
408.4MGOCAPPED CONNECTION AT 9 O' CLOCK AT
400.6SAP
400SRPVISIBLE/PROJECTING
408.4AMH18 0748
2SRPVISIBLE/PROJECTING

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2018-05-09T11:44:34-07:00
is_lateral_inspection