Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2018, 05:23 AM
  • 18 0763A_18 0763 _09052018_223442.mp4

Date
05/09/2018
W/O
701388
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14621
Time
10:23 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5316
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_701388_TV18103_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0763A
Downstream MH
18 0763
Dir. of Survey
Downstream
Length Surveyed
376.3 ft.
Total Length
376.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 18 0763A to 18 0763
MH: 18 0763AMH: 18 0763downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 0763A9.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start101.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"150.3 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 8"161.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 9"371.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish372.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish376.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0763376.3 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING start

    9.9 ft. - General Observation - MAGNEZIUM H.O COATING start

Observations (12)

DistanceCodeObservation
0MWM
9.9SAP
371.7SAP
372.2MGOMAGNEZIUM H.O COATING finish
161.6TFA
376.3AMH18 0763
0MWL
376.3MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
150.3TFA
9.9MGOMAGNEZIUM H.O COATING start
0AMH18 0763A
101.2TFA

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2018-05-09T22:23:46-07:00
is_lateral_inspection
false