Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2018, 08:51 AM
  • 02 1399_02 1398 _08052018_022625.mp4

Date
05/08/2018
W/O
701119
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00349
PipeID
P02970
Time
1:51 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5660
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
BELL GARDENS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
WO_701119_TV02220_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
02 1399
Downstream MH
02 1398
Dir. of Survey
Downstream
Length Surveyed
940.6 ft.
Total Length
940.6 ft.
Structural Index
3
Structural Quick
3e00
Structural Rating
567
O&M Index
4
O&M Quick
4800
O&M Rating
32
Overall Index
3
Overall Quick
Overall Rating
599
Pipe schematic from manhole 02 1399 to 02 1398
MH: 02 1399MH: 02 1398downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 13990 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. LR - Alignment Right, 25 %, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT41.4 ft. LR - Alignment Right, 25 %, Finish237 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"535.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"638.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"736.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"748 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"770.2 ft. SAV - Surface Aggregate Visible, at 12 o'clock, within 8 inches of joint: NO840.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"935.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"940.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish940.6 ft. AMH - Downstream Manhole, Survey Ends - 02 1398

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, at 12 o'clock, within 8 inches of joint: NO

    770.2 ft. - Surface Aggregate Visible, at 12 o'clock, within 8 inches of joint: NO

Observations (17)

DistanceCodeObservation
237TF
2.1LR
940.6SAP
535.3TFC
840.2TFC
935.7TFA
2.1SAP
736.1TFC
41.4LR
748TF
940.6AMH02 1398
770.2SAV
0MWL
0AMH02 1399
638.8TFC
2.1MGOMAG COAT
0MWM

Properties (5)

additional_info
SC359316
custom_field_two
2
customer
LACSD
datetime
2018-05-08T01:51:10-07:00
is_lateral_inspection
false