Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 09:37 AM
  • 02 1406_02 1405 _09052018_024834.mp4

Date
05/09/2018
W/O
701119
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00349
PipeID
P02977
Time
2:37 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5661
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Routine Assessment
Project
WO_701119_TV02220_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
02 1406
Downstream MH
02 1405
Dir. of Survey
Downstream
Length Surveyed
350.1 ft.
Total Length
350.1 ft.
Structural Index
4
Structural Quick
5M3S
Structural Rating
653
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
653
Pipe schematic from manhole 02 1406 to 02 1405
MH: 02 1406MH: 02 1405downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 14060 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start61.2 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start152.9 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start350.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1405350.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish350.1 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    61.2 ft. - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    286 ft. - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
286SRP
350.1AMH02 1405
2.1SAP
0AMH02 1406
2.1SRV
0MWM
350.1SRV
61.2SRP
350.1SRP
0MWL
350.1SAP
152.9SRP

Properties (5)

additional_info
SC359317
custom_field_two
2
customer
LACSD
datetime
2018-05-09T02:37:23-07:00
is_lateral_inspection
false