Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2018, 10:54 AM
  • 21 0610_21 0646_17052018_035749.mp4

Date
05/17/2018
W/O
695754
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00787
PipeID
P15799
Time
3:54 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5596
Sewer Name
21 TRI-CITIES OUTFALL RELIEF TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
15
Purpose
Routine Assessment
Project
WO_695754_TV21086_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
21 0610
Downstream MH
21 0646
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 21 0610 to 21 0646
MH: 21 0610MH: 21 0646downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 06460 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Ends - 21 06462 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (8)

DistanceCodeObservation
0MWL
2DAGS
2SRV
0AMH21 0646
2SSS
2AMH21 0646
0MWM
2SAP

Properties (5)

additional_info
SC359362
custom_field_two
2
customer
LACSD
datetime
2018-05-17T03:54:06-07:00
is_lateral_inspection
false